In: Proceedings of the 10th International Conference on Application and Theory of Petri Nets, 1989, Bonn, Germany, pages 378-393. 1989.
Abstract: The goal of this paper is to insure the industrial credibility of a simulation study using Petri nets. This study represented a two month load for one person. Three weeks were necessary to analyse the problem, realise the model and run first simulations. Two weeks were in fact necessary to design and debug the model. The Petri net theory is the reason of this fast answer time.